The refurbishment of this building included the remodeling of the entrance portal and the renovation of its seven floors of offices, with the division of each floor in two open offices aiming a greater flexibility for future users.
Each floor is identified with a different color in the entrance halls, which are delimited by translucent glass panels and phenolic plywood lining.
This glass box set up in the lobby is penetrated by natural light through the offices, a natural light which is complemented by LED strips placed behind some of the glass panels.